Video Tutorial Index

3 minutes
3 months ago

Video Tutorial Index

This index is an alphabetical listing of all available ConstructEx video tutorials. For a listing of videos by category, please see the Video Tutorials page.

Adding a Construction Phase Package (Duration 9m:26s)

Adding a Design/Bid Package (Duration 7m:01s)

Adding and Issuing a New Field Report (Duration 8m:10s)

Adding a Field Report Item to an Issued Field Report (Duration 3m:50s)

Adding a Meeting (Duration 5m:03s)

Adding a Message (Duration 4m:30s)

Adding a Submittal as a Subcontractor or Contractor (Duration 4m:56s)

Adding a User (Duration 3m:46s)

Adding an RFI as a Subcontractor or Contractor (Duration 4m:19s)

Adding and Editing Message Forum Categories (Duration 3m:32s)

Answer an RFI as a Design Team Lead (Duration 5m:41s)

Answer an RFI as a Secondary Reviewer (Duration 5m:44s)

Close a Submittal as a Contractor (Duration 3m:59s)

Close an RFI as a Contractor (Duration 4m:24s)

Configure the Submittals Module and Prepare the Template for Import (Step 2) (Duration 4m:52s)

Configuring the Construction Phase Documents Module (Duration 6m:51s)

Configuring the Design/Bid Packages Module (Duration 3m:07s)

Configuring the Field Reports Module (Duration 4m:29s)

Configuring the Meeting Minutes Module (Duration 3m: 26s)

Configuring the RFIs Module (Duration 6m:25s)

Configuring the Submittals Module (Duration 6m:26s)

Creating a Logo (Duration 7m:36s)

Creating a Register Using the Submittal Register Grid (Duration 10m:20s)

Creating a Sheet or Specification Index from the Template (Duration 4m:38s)

Creating a Spatial Index from the Template (Duration 4m:32s)

Creating Cover Sheets (Duration 14m:50s)

Creating Quality Control Items with the Capture App (Duration: 8m:26s)

Deleting a Sheet or Specification Index (Duration 1m:48s)

Downloading a Current Set of Drawings and Specifications (Duration 3m:51s)

Field Management Training (Duration 40m:26s)

Forward a Submittal as a Design Team Lead (Duration 2m:39s)

Forward an RFI as a Design Team Lead (Duration 3m:18s)

Import the Submittal Register Into Your Project (Step 3) (Duration 3m:51s)

Importing a Sheet or Specification Index (Duration 2m:30s)

Importing a Spatial Index (Duration 4m:08s)

Introduction to ConstructEx Spatial Index and Quality Control (Duration 29m:45s)

Maintaining a Current Set of Drawings and Specifications (Duration 6m:01s)

Maintaining a Submittal Register (Duration 4m:41s)

Populate the Submittal Register Template (Step 1) (Duration 5m:10s)

Printing and Generating Reports with the All+Expected Log (Duration 6m:13s)

Purging an Existing Spatial Index (Duration 2m:56s)

Return a Submittal as a Design Team Lead (Duration 4m:48s)

Return a Submittal as a Secondary Reviewer (Duration 4m:41s)

The Submittal and RFI Workflow (Duration 7m:49s)

User Role Display Names (Duration 5m:56s)

Using a Submittal Register (Duration 6m:46s)

Using the All+Expected Log (Duration 6m:35s)

Using the Field Reports App (Duration 9m:25s)

Using the Markup Tools (Duration 6m:00s)

Using the Plans App (Duration 16m:06s)

Using the Tasks App (Duration 8m:07s)

View Budget Info (Duration 2m:09s)

View Project Info (Duration 2m:27s)